Liverpool Road Retarding Basin Upgrade
We’re upgrading Liverpool Road retarding basin in Boronia, to ensure a safe drainage system and prevent surrounding homes from flooding.
We’re upgrading Liverpool Road retarding basin in Boronia, to ensure a safe drainage system and prevent surrounding homes from flooding.
We’ve completed the modification works to strengthen and extend the life of the Blind Creek footbridge in Fairpark Reserve. The bridge is open and detours around the Blind Creek Trail have been removed.
The Hallam Valley wetlands are now open to the community again following works to improve how the wetland functions.
We’re embarking on a major program that will see over 60km of the Birrarung (Yarra River) receive a dedicated renewal over five years from 2022-2026 to help promote the health of our landmark waterway.
The Port Melbourne Drainage Pump Station on Esplanade West was built in 1891 to provide flood protection to a catchment of 126 hectares across the Port Melbourne area. The station houses four pumps that pump storm water from the historical wetlands out into Port Phillip Bay.
Three of the pumps were installed in 1951, with the fourth installed in 1981. All four pumps are nearing the end of their service life and require upgrading to ensure flood mitigation services are continued to be provided in Port Melbourne.
As part of the works, a cross-connecting drainage point located within Lagoon Reserve, off Graham Street, will be upgraded to prevent sea water from re-entering and corroding drain and pump station assets in the future.
In Melbourne, our rivers and creeks are essential to our way of life. That’s why at Melbourne Water we’re removing weeds and planting native plants along a 3km stretch of Haunted Gully Creek. Once established, the vegetation will protect the banks of the creek and provide habitat so our native wildlife can thrive.
We’re undertaking a four-year program of weed control and revegetation works to improve the condition of native vegetation along Malcolm Creek in Mount Ridley Nature Conservation Reserve.
Upgraded the electrical and control equipment of the pump station along the Yarra River opposite the entrance to Crown Casino on Southbank Boulevard. During storm events the pumps allow a faster rate of flow for water into the river when the drains are at capacity.
We’re installing a new pressure reducing valve in the St Helena pipe-track, located off St Helena Road, St Helena.
In Melbourne, water is essential to our way of life. Today, clean, affordable water is readily available to our homes and businesses whenever we need it. Running from Beaconsfield to Langwarrin, the M418 water main is integral to the water supply for the Mornington Peninsula area. The main consists of divide and air valves to allow for outages, maintenance works and functionality. We’re conducting improvement works to ensure it continues to operate efficiently throughout the Cranbourne community, today, tomorrow and for generations to come.