Fencing and safety
For public safety the need for fencing of all structures should be considered. For example, all inlet and outlet structures in the proposed system will require fencing.
For public safety the need for fencing of all structures should be considered. For example, all inlet and outlet structures in the proposed system will require fencing.
This section details the maintenance requirements for underground drains and channels.
The manual outlines our requirements for best practice waterway design to help professionals working in the land development industry who design, construct and establish waterways in new urban developments.
The manual outlines our requirements for best practice constructed wetland design, to support consistent delivery of high-quality constructed wetlands across the Port Phillip and Westernport region.
This describes the structural design requirements for drainage systems. It includes details on pipe drains and associated concrete structures.
Additional factors which should be considered during the preparation of the design include:
'As constructed' information for underground pipelines can be difficult to obtain due to the nature of Works involved
Loss coefficient for pits and junctions
All plans for drainage works must be available in CAD, PDF and hard-copy formats at a scale drawn relevant to an A1 size plot of the drawing. The drawing must contain borders and title blocks that comply with our requirements.