Projects
Crown Casino Pump Station switchboard upgrade project
Upgraded the electrical and control equipment of the pump station along the Yarra River opposite the entrance to Crown Casino on Southbank Boulevard. During storm events the pumps allow a faster rate of flow for water into the river when the drains are at capacity.
Elster Creek Catchment Flood Management Plan
- Bentleigh
- Bentleigh East
- Brighton East
- Carnegie
- Caulfield
- Caulfield East
- Caulfield South
- Elsternwick
- Gardenvale
- Glen Huntly
- McKinnon
- Murrumbeena
- Ormond
- Moorabbin
- Highett
- Elwood
We’re taking a holistic approach to reducing flood risk in Elster Creek Catchment, collaboratively implementing the Elster Creek Catchment Flood Management Plan 2019-24 with the cities of Bayside, Glen Eira, Kingston and Port Phillip.
Elster Creek Litter Collaboration
Melbourne Water is collaborating with Glen Eira City Council, Bayside City Council, City of Port Phillip, the Environment Protection Authority Victoria, and other partners to develop a holistic, data-driven approach to preventing litter entering Port Phillip Bay through Elster Creek.
Elwood Main Drain Duplication Project
Melbourne Water is increasing the capacity of the Elwood Main Drain to reduce flooding in the Elster Creek catchment.
Hawthorn East Retarding Basin Upgrade
We're upgrading the Hawthorn East Retarding Basin, located next to Rathmines Reserve, to ensure a safe drainage system and prevent surrounding homes from flooding.
Koornang Main Drain investigations
In partnership with Glen Eira City Council, we’ve commissioned several studies into options for mitigating flooding from the Koornang Main Drain, which services the suburbs of Ormond and McKinnon.
Lilydale drainage assets - ongoing maintenance works
Melbourne Water undertakes routine inspections and maintenance of Lilydale Drain and other drainage assets within the local area. To maintain these assets at times maintenance and desilting works are required.
Port Melbourne Drainage Pump Station Upgrade
The Port Melbourne Drainage Pump Station on Esplanade West was built in 1891 to provide flood protection to a catchment of 126 hectares across the Port Melbourne area. The station houses four pumps that pump storm water from the historical wetlands out into Port Phillip Bay.
Three of the pumps were installed in 1951, with the fourth installed in 1981. All four pumps are nearing the end of their service life and require upgrading to ensure flood mitigation services are continued to be provided in Port Melbourne.
As part of the works, a cross-connecting drainage point located within Lagoon Reserve, off Graham Street, will be upgraded to prevent sea water from re-entering and corroding drain and pump station assets in the future.