Planning, design and approvals
Pre-construction activities
Melbourne Water is committed to enhancing life and liveability for Melburnians. To maintain our world-class sewerage system, we have upgraded the last remaining section of the Maribyrnong River Main (MRM) Sewer in Essendon West and Aberfeldie.
The MRM Sewer is 8.8 kilometres long and one of the main sewers in Melbourne Water's 400-kilometre network. Each day, it transports approximately 24 million litres of sewage from 36,000 properties in Melbourne's north-western suburbs to the Western Treatment Plant in Werribee, where it is treated.
Built in stages between 1963 and 1977, the condition of the MRM Sewer had deteriorated and needed to be upgraded.
Between 2018 and 2022 we progressively relined the sewer, which was an important initiative for the residents of the north-west suburbs, to ensure they continue to be provided with a secure and reliable sewerage service for decades to come.
Planning, design and approvals
Pre-construction activities
Sewer upgrade works Stage 1: Along The Boulevard from Riverside Park to Maribyrnong Park
The project's first stage involved relining one kilometre of the MRM sewer under The Boulevard (from Riverside Park near Fawkner Street to Maribyrnong Park), and the rehabilitation of 14 maintenance holes.
Sewer upgrade works Stage 2: Afton Street Conservation Reserve
The second stage of the project involved relining 250 metres of the Maribyrnong River Reliever (MRR) which is a section of sewer pipe that helps to remove and hold extra sewage flows from the MRM Sewer, particularly during peak wet weather events.
This section, located at Afton Street Conservation Reserve, included the rehabilitation of three maintenance holes. Works in this section were completed at night when sewer flows are low.
Works for this project have now been completed, with the exception of one manhole, which will now be completed as part of the Epsom Road Main Sewer Renewal. The remaining manhole is expected to be relined in mid to late 2022.
Works for this project have now been completed, with the exception of one maintenance hole, which will now be completed as part of the Epsom Road Main Sewer Renewal. The remaining maintenance hole is expected to be relined in mid to late 2022.
Upgrading the sewer involved:
The technique we used to upgrade the sewer is called 'Spiral Wound PVC'. This involves unwinding the relining material as a flat strip from a spool at the top of the maintenance hole. The new plastic sleeve is wound into place, lining the inside of the existing sewer pipe. The gap between the existing pipe and new liner is then filled with cement (called grouting).
Being a trenchless technology, relining is the best way to repair ageing or damaged sewer pipes as it means we do not need to dig up the pipe, minimising impacts on the local environment and the community. This work can be performed by accessing existing maintenance.