Early planning
Early planning is important to ensuring a successful WSUD project.
Early planning is important to ensuring a successful WSUD project.
The concept design stage involves selecting the type, location and approximate size of stormwater treatments.
The functional design stage contains the next level of detail following the approved concept design.
Plants species used in raingardens, wetlands and swales must be perennial with an extensive fibrous root system.
Keep a close eye on construction to make sure the design drawings and specifications are followed. A few simple mistakes can cause plants to not survive or thrive.
You should generally inspect water sensitive urban design (WSUD) assets every three months for maintenance once the plants are established.
The following checklists, design examples and case studies have been developed by Melbourne Water for use by councils.
Grants and other assistance through the Liveable Communities, Liveable Waterways Program is provided by Melbourne Water Corporation of 990 Latrobe Street Docklands, Victoria ("We, Us").
Use of and access to the Liveable Communities, Liveable Waterways Program and the Incentives System registration and application platform (together, the “Program”) by you as the user (“You”) is governed by these Terms of Use.
Melbourne Water will be constructing a new water treatment plant in Mount Evelyn.
Case study: Underwater drones are reducing the effort and cost of mapping sludge build-up in wastewater treatment lagoons.