Indemnity and insurance conditions 3.12
Overview of conditions including liability, insurance, material damage and Workcover.
Overview of conditions including liability, insurance, material damage and Workcover.
A Certificate of Completion will be issued by us when all the requirements of the agreement have been satisfied.
The requirements (if applicable), include:
We're responsible for the operation and maintenance of the Works and associated costs from the date of the Certificate of Completion, except where costs are incurred as a re
When a developer is designing and constructing one of our wetlands or retarding basins, often we and the local council are expected to have joint maintenance responsibilities wit
Use our checklists and statement templates to provide us with the right information in your application or to guide development steps.
Download a variety of previous standard or concept drawings to assist with your proposed development.
Drainage schemes are used to plan the infrastructure for new urban developments. They guide the standards you need to meet for flood protection, water quality and waterway health.
We are re-coating the Patterson Lakes Tidal Gates with an anti-corrosive paint, protecting them from corrosion so they can continue protecting the community from localised flooding.