Grass cutting maintenance
We cut grass across 4155 hectares of land that we own, through our annual scheduled maintenance program.
Small actions, big impact: How you can help Victoria's frogs this October
Immerse yourself in nature this October and help frog conservation by participating in Frog Month Victoria.
Port Melbourne Drainage Pump Station Upgrade
The Port Melbourne Drainage Pump Station on Esplanade West was built in 1891 to provide flood protection to a catchment of 126 hectares across the Port Melbourne area. The station houses four pumps that pump storm water from the historical wetlands out into Port Phillip Bay.
Three of the pumps were installed in 1951, with the fourth installed in 1981. All four pumps are nearing the end of their service life and require upgrading to ensure flood mitigation services are continued to be provided in Port Melbourne.
As part of the works, a cross-connecting drainage point located within Lagoon Reserve, off Graham Street, will be upgraded to prevent sea water from re-entering and corroding drain and pump station assets in the future.
Mordialloc Main Sewer Rehabilitation Project
We are upgrading sections of the Mordialloc Main Sewer (MRD) from Chute Street along White Street to Malcolm Road. Ensuring we maintain our world class sewerage system today, tomorrow and for generations to come.