Working on live assets 3.10

​All work on our underground drainage assets, including stormwater connections to our drains, must only be undertaken by Contractors who meet the following criteria:

  1. evidence of current training in Confined Space entry procedures as detailed in our Work Procedures for Confined Space Entry
  2. evidence of the existence and adherence to a Health and Safety System which complies with the Victorian WorkCover Authority's 'SafetyMAP' standard
  3. evidence of a quality plan demonstrating our specifications for stormwater connections can be met.

 

Last updated: